Dry Bulk Terminals
By the end of 2008 totally 15 berths were completed like Wugang ore terminal, Jiulong Paper break bulk terminal, Huaneng Power Plant coal terminal, Environment-friendly Power Plant coal terminal, etc. with overall length of 2,558 meters and design capacity of 48.22 million tons plus 18 handling facilities and 150,000-square-meter yards.
At present, four berths of Wanfang break bulk terminal with length of 791 meters and design capacity of 3.5 million tons are under construction and will be put into operation in this year. In the planned Huaneng coal warehousing and distribution center and Meijin-HSBC break bulk terminal, we will respectively build two 50,000DWT berths with 570m length and 24 million tons of design capacity and three 50,000DWT with 755m length and 3.8 million tons of design capacity together with 13 other berths