Petrochemical Terminals
At the end of 2008, 15 berths of Mobil, Changjiang, Yang Hong Petrochemicals have been built up with 1,354-meter berths and design capacity of 7.05 million tons plus 850,000 cubic meters of tanks.
At the end of 2008, 15 berths of Mobil, Changjiang, Yang Hong Petrochemicals have been built up with 1,354-meter berths and design capacity of 7.05 million tons plus 850,000 cubic meters of tanks.
Jiangsu Taicang Port Administration Committee
Add: 8 Beihuan Rd, Taicang Port Development Area, Jiangsu Province
Web: www.tcport.gov.cn
Tel: +86 (0)512 53186572/53186509 Fax: +86 (0)512 53186510 Z.C.: 215438